Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work
Open Access
Online Resource
Type Journal Article
Year 2024
Language English
Views 46
Downloads 0
Business Administration

Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work

Putri Lynna Luthan , Nathanael Sitanggang, Syahreza Alvan, Wisnu Prayogo
External / Open Access
2024 Journal of Applied Engineering and Technological Science DOI: 10.37385/jaets.v5i2.1994

Abstract


This study aims to analyse the causes of delays in the implementation of construction projects caused by management (owners/consultants) and production (contractors). The research sample consists of 56 respondents who are directly involved in the implementation of construction projects (owners, consultants, contractors, field supervisors, and estimators). The quantitative data analysis technique used was descriptive analysis technique, while the qualitative data obtained by interviewing 5 construction project experts was analysed by qualitative descriptive method. To analyse the causes of delays in project implementation, an analysis technique using the Relative Importance Index (RII) formula was used with a reference value of RII> 0.710. The results showed that 1) the average RII on management factors was 0.895> 0.710. This means that management factors (owner/consultant) can cause delays in the implementation of construction projects; 2) the average RII on production factors is 0.917> 0.710. This means that production factors (contractors) can cause delays in the implementation of construction projects. This means that production factors (contractors) can cause delays in the implementation of construction projects. This research is directly useful for construction service providers and contributes to the development of Project / Construction Management science.
Full Title Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work
Primary Author Putri Lynna Luthan
Co-Authors Nathanael Sitanggang, Syahreza Alvan, Wisnu Prayogo
Publication Type Journal Article
Year 2024
Journal Journal of Applied Engineering and Technological Science
Volume / Issue Vol. 5, No. 2
Category Business Administration
Institution External / Open Access
Access Open Access
Added to Library March 24, 2026

Cite This Publication

APA
Putri Lynna Luthan, Nathanael Sitanggang, Syahreza Alvan, Wisnu Prayogo (2024). Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work. *Journal of Applied Engineering and Technological Science*, 5(2), .
MLA
Putri Lynna Luthan. "Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work." *Journal of Applied Engineering and Technological Science*, vol. 5, no. 2, 2024, pp. .
DOI
https://doi.org/10.37385/jaets.v5i2.1994